QINGDAO BOXWELL CONTAINER CO. IS THE OFFICAL MANUFACTURING PARTNER OF BOXWELL LLC.
English
Boxwell custom container units at manufacturing facility
ISO & Offshore & Customized Container Solutions
Home » Products » Offshore Containers » Offshore Waste Skip » DNV-ST-E271 Certified Offshore drill cutting bins / Mud Skip

DNV-ST-E271 Certified Offshore drill cutting bins / Mud Skip

The DNV-ST-E271 Certified Offshore Mud Skip ensures safe and efficient handling of drilling waste, construction debris, and offshore bulk materials with its heavy-duty construction and self-tipping mechanism. Engineered for harsh marine environments, it meets DNV-ST-E271 standards for reliable lifting and transportation in offshore operations.

- Heavy-duty steel construction with reinforced lifting points for maximum safety
- Self-tipping mechanism for fast, manual-free unloading and improved efficiency
- Marine-grade anti-corrosion coating for durability in salt spray and harsh weather
- Customizable options: tipping mechanisms, drainage holes, locking systems, and covers
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
  • DNV-ST-E271 Certified Offshore mud skip

  • Qingdao Boxwell

Product Advantages

Designed for Offshore Waste Handling

The DNV-ST-E271 Certified Offshore Mud Skip is designed for the collection, storage, lifting, transportation and discharge of waste generated during offshore drilling, maintenance and marine operations.

Suitable materials include:

● Drilling mud

● Drilling cuttings

● Contaminated materials

● Scrap steel

● Construction debris

● Industrial waste

● General offshore waste

● Other suitable bulk waste materials

This makes the skip a dedicated offshore waste-handling product rather than a conventional cargo container or storage box.

Self-Tipping Discharge Design

A key feature is the self-tipping mechanism, which is intended to support faster and more efficient unloading of collected material.

The tipping arrangement reduces the need for manual handling during discharge and can improve turnaround when waste is transferred at the designated unloading location.

Mud skips can also be customized with either automatic or manual tipping mechanisms according to project requirements.

The final tipping mechanism and operating procedure should therefore be confirmed in the approved technical drawing.

9,300 kg Payload

The weight specifications are:

● Payload: 9,300 kg

● Tare Weight: 1,700 kg

This provides substantial capacity for appropriate offshore waste materials, subject to the approved loading arrangement, material density, center of gravity and certified structural limits.

Certified Offshore Lifting Points

The Mud Skip includes four certified lifting pad eyes for offshore crane handling.

These lifting points form part of the engineered offshore structure and should be used according to the approved certification documentation and lifting procedure.

A compatible sling set is available as an optional configuration.

Forklift Handling

Forklift pockets are available, providing an additional handling option during suitable shore-base, yard or deck operations.

Forklift handling should follow the approved product configuration and site operating procedure.

Heavy-Duty SPA-H Steel Structure

The Mud Skip uses SPA-H steel together with heavy-duty steel plates, reinforced structural components and reinforced lifting areas.

The structure is designed around repeated offshore lifting and waste-handling operations rather than conventional ISO freight-container use.

Leak-Resistant Waste Containment

The Mud Skip has a leak-resistant structure and optimized internal design intended to improve waste containment and reduce the risk of material release during handling.

This is particularly relevant when the skip is used for drilling mud, cuttings or contaminated offshore waste.

The term should remain leak-resistant, rather than being upgraded to an unsupported claim of completely leak-proof containment.

Marine Anti-Corrosion Protection

The anti-corrosion protection includes:

● Sa2.5 blast cleaning

● Zinc-rich epoxy primer

● Epoxy intermediate coat

● Polyurethane top coat

The coating system is intended to withstand salt spray, moisture and harsh offshore weather conditions.

Project-Specific Customization

Customization options include:

● Different capacities

● Project-specific dimensions

● Automatic or manual tipping mechanisms

● Drainage holes

● Locking systems

● Tarpaulin covers

● Company branding

● Customized colors

The final configuration should be confirmed according to the material being handled and the customer's offshore operating requirements.

Application

The DNV-ST-E271 Certified Offshore Mud Skip is intended primarily for offshore waste-management applications where material must be collected, lifted, transported and discharged using an engineered offshore handling unit.

Offshore Drilling Waste

The skip can be used for appropriate waste generated during offshore drilling activities, including:

● Drilling mud

● Drilling cuttings

● Other drilling-related solid or semi-solid waste

The actual suitability of the waste should be confirmed according to its physical and chemical properties and the approved skip configuration.

Offshore Oil and Gas Platforms

Offshore oil and gas exploration and offshore platforms are primary applications.

The skip can form part of the waste-handling chain between work areas, offshore installations, supply vessels and shore bases.

Drilling Rigs

The heavy-duty steel structure, lifting points and tipping arrangement make the product suitable for applicable drilling-rig waste-handling operations.

Drilling rigs are among the intended use environments.

FPSO Operations

Floating Production Storage and Offloading units (FPSOs) are among the product's applications.

The skip can be used for collection and movement of appropriate operational or maintenance waste generated onboard.

Offshore Supply Vessels

The product is also intended for use within logistics involving Offshore Supply Vessels (OSVs).

Its certified lifting arrangement supports transfer between suitable offshore facilities, vessels and shore bases according to the approved lifting procedure.

Marine Construction

Construction debris, scrap steel and other suitable waste generated during marine construction can also be handled using the Mud Skip.

Offshore Maintenance Waste

The skip can be used for appropriate waste and scrap materials generated during maintenance, repair and equipment-replacement activities.

General Offshore Waste Management

Offshore transport equipment is subject to higher requirements for structural design, welding, inspection and offshore lifting than ordinary freight containers.

This supports the use of dedicated offshore-certified equipment such as Mud Skips where waste must be handled between offshore installations and vessels.

Technical Specifications

Specification

Details

Product Name

DNV-ST-E271 Certified Offshore Mud Skip

Brand

Qingdao Boxwell

Product Category

Offshore Containers → Offshore Waste Skip

Standard

DNV-ST-E271

External Length

2202 mm

External Width

1842 mm

External Height

1457 mm

Material

SPA-H Steel

Design Temperature

-20°C

Lower Design Temperature

Available according to project requirements

Surface Preparation

Sa2.5 Blast Cleaning

Primer

Zinc-Rich Epoxy

Intermediate Coat

Epoxy

Top Coat

Polyurethane

Floor / Base

Steel

Discharge System

Self-Tipping Mechanism

Forklift Pocket

Available

Lifting Pad Eyes

Four Certified Pad Eyes

Sling Set

Optional

CSC Plate

N/A

Color

Customized RAL Color

Payload

9,300 kg

Tare Weight

1,700 kg

Optional Configurations

Automatic / Manual Tipping, Drainage Holes, Locking Systems, Tarpaulin Covers, Branding

Certification & Documentation

Certification

Depending on project requirements, the following documentation can be provided:

  • DNV-ST-E271 Certification

  • CSC Plate (Optional)

  • Third-Party Inspection Certificate

  • Welding Records

  • NDT Reports

  • Load Test Reports

  • Paint Inspection Reports

  • Dimensional Inspection Reports

  • User Manual

  • Packing List

Certification

Manufacturing Process

Every offshore container passes through a complete manufacturing process under strict quality control.

Manufacturing Process

Quality Assurance 

Quality Assurance

Why Choose Boxwell?

Dedicated Offshore Waste Skip Product Category

We maintain Offshore Waste Skip as a dedicated product category within our Offshore Containers range, alongside offshore cargo containers, baskets, bottle racks, tool boxes, workshops and frames.

This Mud Skip is therefore a purpose-developed offshore waste-handling product rather than a modified standard shipping container.

Experienced Offshore Engineering Team

Our core engineering and R&D team has more than 20 years of industry experience in offshore containers, special containers and customized equipment solutions.

This figure refers to the experience of our professional team rather than the age of our company itself.

Custom Engineering Capability

We support:

● Customer drawing-based production

● Technical specification-based manufacturing

● Non-standard offshore product development

● Project-specific structural design

● Customized dimensions and accessories

This is particularly relevant to Mud Skips because waste type, payload, tipping method and containment requirements can differ significantly between projects.

DNV and International Standards Capability

Our products can be designed and manufactured according to standards including:

● DNV 2.7-1 / DNV-ST-E271

● EN 12079

● CSC

● ISO

● Other project-specific requirements

For this specific Mud Skip, DNV-ST-E271 is the applicable standard.

Established Manufacturing Facility

We were founded in May 2020 in Jiaozhou, Qingdao.

Our factory covers approximately 60,000 m², including 32,000 m² of workshop space, with more than 200 workers.

Structured Quality Management

Our quality-management system covers:

● Raw material inspection

● Production-process monitoring

● Final product testing

● Modern testing equipment for product verification

Third-Party Inspection Support

We cooperate with independent inspection agencies and classification societies according to project and certification requirements.

End-to-End Project Support

Our service scope includes:

● Pre-sales technical consultation

● Engineering and solution design

● Manufacturing

● Production monitoring

● Quality control

● Testing and certification support

● Third-party inspection coordination

● Logistics and shipment coordination

● After-sales technical support

Boxwell

FAQ

1. What is a DNV-ST-E271 Certified Offshore Mud Skip?

It is a dedicated offshore waste-handling unit designed for collecting, lifting, transporting and discharging waste generated during offshore drilling, maintenance and marine operations.

We manufacture this model according to DNV-ST-E271.

2. What materials can be handled?

Suitable materials include:

● Drilling mud

● Drilling cuttings

● Contaminated materials

● Construction debris

● Scrap steel

● Industrial waste

● General offshore waste

The final suitability should be confirmed according to material density, physical properties and any applicable environmental or hazardous-material requirements.

3. What are the dimensions and payload?

The specifications are:

● Dimensions: 2202 × 1842 × 1457 mm

● Payload: 9,300 kg

● Tare Weight: 1,700 kg

Final loading should comply with the approved structural and certification limits.

4. Does the Mud Skip have a self-tipping mechanism?

Yes. This product features a self-tipping mechanism for efficient discharge.

Automatic or manual tipping configurations are also available according to project requirements.

5. Is the Mud Skip leak-proof?

The Mud Skip has a leak-resistant structure.

It should therefore not be described as completely leak-proof unless a specific containment or leakage test requirement is confirmed for the ordered unit.

6. What lifting and handling features are included?

The configuration includes:

● Four certified lifting pad eyes

● Forklift pockets

● Optional sling set

The lifting arrangement should follow the approved DNV-ST-E271 certification documentation.

7. What is the design temperature?

The standard design temperature is -20°C.

Lower-temperature designs are available, but a fixed minimum lower temperature is not specified.

8. Does the Mud Skip have a CSC plate?

No.

CSC Plate: N/A.

This product is designed as an offshore waste-handling unit rather than a conventional CSC-approved ISO shipping container.

9. What information should I provide when requesting a quotation?

For an accurate engineering review, it is recommended to provide:

● Waste or material type

● Material density

● Required capacity

● Required payload

● Required dimensions

● Preferred tipping mechanism

● Drainage requirements

● Tarpaulin-cover requirements

● Locking requirements

● Required design temperature

● Sling-set requirement

● Required certification

● RAL color and branding

● Operating environment

● Quantity

● Delivery destination

Our engineering team can then develop the final Mud Skip configuration according to the actual waste-handling, lifting and offshore project requirements.

Previous: 
Next: 

Get Your Custom Container Quotation Now

Since its establishment, the company has actively expanded its market and developed products covering hundreds of different types. Its products have been exported to both domestic and overseas markets.

Quick Links

Product Category

Contact Us

Telephone: +86-13791987807
Email: benson@qpclcontainer.com
Address: No,4 Xiangjiang Branch Road, Core area of Shanghe Demonstration Zone, Jiaozhou, Qingdao City, Shandong
Copyright © 2026 BOXWELL Offshore & Special Container Manufacturer All Rights Reserved I Sitemap I Privacy Policy